Materials for Repair of the Walls
For full details on the choice of primer materials, for different reasons can be found in the article: The choice of materials for repair of the walls in the apartment. In preparing the solution, follow the instructions on the package. There will be written, how much should be added water, how long to wait for solution, some of his lifetime, and drying time. Under these rules, you can get good stuff for the screed. Drying time of the first layer ties may differ from claimed on the packaging material manufacturer, and this depends on the temperature and humidity in the room.
The lower the temperature, and more humidity, the drying time of more ties. Of great importance, for good ties, Care is packed material. Damage solution must be maintained continuously moist for several days, it neutralizes the drying up of local ties and cracking in these areas. Once passed the time required for drying the first layer, you can start the device, the subsequent layers. The bath and kitchen need to install underfloor heating.
Further work on the device ties in these areas will be depend on the type of floor heating. For more information on choosing different types of floor heating can be found in the article: What is the device warm pol.Posle warm floor, these rooms are ready to lay into them granite. In other rooms the apartment to apply a second layer of screed. This will be the final layer, and produce it using samoniviliruyuschih solutions. Samoniviliruyuschie solutions are good and friendly building materials, using them aligned small irregularities that remain when filling the first layer, provides an opportunity to tie the level of up to 1mm. When working with these materials, as necessary to comply with the manufacturer's recommendations listed on their packaging. Particular attention should be paid to the care of a coupler, you can never overdry material, it should always be moderately moist, it save you from possible cracks in the screed. After drying, the second layer of screed, these premises are ready to drive on them, the finished floor – parquet flooring and granite. Checking the work done. But before begin laying finishing materials, it is necessary to revise ties made. In general, for repairing the apartment, you need to make it a rule, make a detailed inspection carried out by separate stages of construction work. It is necessary to identify possible shortcomings and correct them reasons with minimal losses. Imagine what would happen if you made a mistake with the level of ties, or improperly installed floor heating, or forgot to communication. You would have to break down not only part of the tie, but the final finishing of the floor, and it's very different costs and they are quite large. You need to check on the evenness of the screed, the deviation from the horizontal. On building codes, it is 2mm per 1m length. Drop the horizon should not exceed 50mm, if it does not provide design solutions. Carry out tapping tie, if found empty, open them and pour fresh solution, the same thing done and with cracks. If, after the survey made tie, you are satisfied, you can begin laying finishing materials. Articles, how to select and produce packing parquet and granite, and other finishing materials of sex, will be published shortly.
Comments